Questionnaire
Questionnaire boiler
TPP Questionnaire
1) Contact person responsible for the specified information
2) Boilerhouse
2.1 Heat-transfer agent:
Water
Steam
Thermal oil
Air
2.2 Parameter requirements:
2.3 Fuel supply principle:
manual
automated supply
2.4 Fuel:
Wood
Wood sawdust and wafer
Wood bark
Wood pellets
Pellets from husk
Sunflower husk
Pellet of straw
Peat
Coal
2.5 Ash handling:
manual
automatized
2.6 Heat Exchanger Cleaning System:
manual
pneumocleaning (pressed air)
2.7 Fuel composition:
available
n/a
3) Heat utilization
3.1 Room heating:
Dimensions of the heated room:
3.2 Hot water supply:
The required amount of hot water:
3.3 Heating for the drying chambers:
Chamber capacity:
3.4 Heat utilization for other technological purposes:
4) Construction and installation work
designing of the boiler-house
construction or reconstruction of the boiler-house
installation works
start-up and commissioning works
modular boiler-house
5) Additional equipment
Pumping equipment
Chemical water treatment
Deaerator
Wood-crushing equipment
1) General project data
Client / Investor:
Project name:
Phone:
E-mail:
Platform Location:
Expected implementation schedule (approval of the plan, signing of the contract, building permit, delivery of the project):
Reconstruction / new installation:
2) Planning
The current stage of the project (preliminary draft / plan approval):
The stage of obtaining environmental permits (IPPC, Environmental Impact Assessment, etc.):
3) Installation site
Location (address, rural / urban)?:
Existing / New building (available data in case of existing building):
Stage of construction planning (plan not yet submitted / already submitted / approved). In the case of an already approved design permit, please provide the plan / plan of the area and the height of the building, or, if planning is underway, indicate the general dimensions of the building.:
Are there any restrictions regarding the building (height / length of the boiler room, size of the place for the condensing unit, size of the room for storing fuel, orientation of the building, etc.)?:
Are there any specific geographical or environmental restrictions (noise / emissions, roads, etc.)?:
Fuel specification
Fuel type:
Type:
Qty (t/a):
Calories (MJ/kg):
Density (kg/m3):
Size/Granulation (mm):
Humidity (%m):
Ash content (% m):
C (%m):
H (%m):
O (%m):
N (%m):
S (%m):
Cl (%m):
F (%m):
Metals (mg/kg):
(%m) – percent by weight
Fuel Preparation (Processing/Grinding Plant - On/Off Site):
Type and frequency and amount of fuel for transportation:
Additional requirements for fuel preparation (grinding):
Changes in fuel supply depending on preliminary or final analysis (CV, humidity, ash, composition, element-wise):
Required storage capacity (uptime hours at 100% load):
4) System specification
General information:
Available data in case of reconstruction:
Fuel power
Factory availability (24 hours / day, days / weeks, hours / year?):
Energy/Steam/Heat Production:
System priority (waste reduction/disposal, electricity production, heat/steam production, etc.)?:
Details of electricity needs, heat/steam (process steam or hot water parameters (quantity/pressure/temperature), heat use: central heating, greenhouse heating, etc.)?:
System requirements (maximum output electric power or efficiency, minimum/maximum/average power of process steam or thermal load, etc.)?:
Capacitor:
Preferred condensing unit (direct air/water cooled condenser, direct air/water cooled condenser with cooling tower, other):
Water availability for a possible water-cooled condenser (groundwater/river/quantity/temperature):
Flue gas / water / noise / emissions:
Dust:
Total organic carbon TOC:
Hydrochloric acid (HCl):
Hydrofluoric acid (HF):
Sulphur dioxide (SO2):
Nitrogen oxides (NO2):
Carbon monoxide (CO):
Heavy metals:
Cd and Ti (total):
Sb,As,Pb,Cr,Co,Mn,Ni,V,Sn (total):
Hg:
Dioxins and furans:
Concentrations are given at 11% O2 by volume in waste gases and 6% for biofuels
Are there any special requirements regarding flue gas emissions?:
Are there any special requirements regarding wastewater, noise or any other emissions?:
Other:
Are there any agreements / arrangements with other suppliers of individual components?:
Supply of auxiliary fuel for starting and WID requirements (NG, LPG):
5) Other
Are there any special requirements for operation and maintenance?:
Are there any financial / investment requirements?:
Additional comments:
Place and date:
Who filled out the document:
Callback
Request a callback
×